ksgf-website-shows-14

On Air

LaTour Retirement Talks

Spillway Gates Opened For Second Time At Table Rock Dam

Spillway Gates Opened For Second Time At Table Rock Dam

Spillway Gates Opened For Second Time At Table Rock Dam

With several inches of rain already fallen recently and more in the forecast, the Corp of Engineers at the Table Rock Lake Dam have decided to open spillway gates for the second time in a week.

Spillway gates at the Table Rock Dam have been opened this morning for a water release by the US Army Corps of Engineers.

The Corps opened nine gates about a foot each at 9 a.m., releasing about nine million gallons of water per minute.

Recommended Posts

Loading...